Soil sampling

  • Processor 1

    A sampling grid scheme defines the locations for excavating soil digs in the field. Disturbed soil samples are collected by auger for soil profile description and classification. Shovels and hacks are necessary tools to start the soil excavation up to one meter depth. Hammering a top ring placed over the steel rings (8 cm high, 7 cm of diameter) allows to insert them into the soil. The disturbed soil samples are then extracted and preserved into plastic bags by preventing evaporation loss.

Activities

 
 

Contact us

Department of Agraria.

Università degli Studi di Napoli "Federico II"

via Università, 100 - Portici

  • Telephone number: 081 2539421

Home Overview Activities Soil sampling